

Jesse remodeled this guest bathroom. He demolished the existing drywall, soffit and bathtub, installed a new tub/shower, hung drywall, installed a toilet, ran electrical and plumbing, hung sheetrock, built a back-lit mirror, and designed and built the cedar vanity.
He used Blender to visualize the design in 3D.
Before and After

Bathroom before

Bathroom after. New everything: tile, paint, tub, toilet, vanity.

Bathroom before

Bathroom after. New everything: tile, paint, tub, toilet, vanity.
Designed in 3D using Blender

3D render to previz what the lighting might look like.

Testing out the full layout in 3D before beginning demolition and construction.
Building Process

Installing new fixtures

Installing new shower/tub

Attaching drawer faces

Staining the vanity

Building the backlit mirror

Installing the mirror
